residential · 2024
From a new roof to marble bathrooms: a house finished top to bottom

The challenge
This house needed work from the top down. The existing roof was stripped back to the wall plate and rebuilt with new joists and rafters — and then we carried on inside, taking the whole house through to finished interiors.
What made it demanding
- Works at height throughout
- Occupied street with restricted access
What we did
- Roof strip-out
- New joists and rafters
- New covering and insulation
- First and second fix
- Bathrooms
- Kitchen
- Decoration
The result
A new roof structure, covering and insulation above, and below it a house finished to a high standard: marble-lined bathrooms, new joinery and bright, finished living spaces.
Photography

The new roof structure going up.








Working from the structural drawings on the new deck.



The house on completion.




The house was completed through to finished interiors.













